Apartment #1 is ready!

We are ready for our first tenants at Boarding House to move in!  Here are the before and afters of the first apartment we tackled here.

img_5054

this shows the apartment the day we bought it. dingy carpet, ripped old linoleum, brown, tobacco stained cabinets

img_5936

And here it is now. we painted the cabinets Alabaster by Sherwin Williams, polished the chrome hardware and chrome light fixture. we knocked out the counter separating the kitchen and living room, which made it possible to add a full sized gas range.

 

We were amazed at how beautifully the original chrome cabinet hardware shined up

Wall color is Edgecomb Grey from Benjamin Moore.

This is the living room. the narrow oak we found under the carpet was in tough shape and did not have enough thickness left to refinish.

 

Instead we installed “cabin grade” hickory.  It was only about $1.25/sq foot!  We stained it and had it professionally finished.
Last but not least… the lovely bathroom.  All we had to do in here was subway tile around the tub, add a shower attachment for the faucet, and paint the walls.  The mirror and light were already there and just needed to be polished and cleaned.
This space is not fancy, but it is clean and bright and will make a great space for someone to call home.

Advertisements

One thought on “Apartment #1 is ready!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s